In addition to the human side of hospitality, there are all the services of the real estate structure that depend on the quality and completeness of the systems implemented and, above all, their reliability over time.
All plant systems need electrical energy to provide adequate services, which is why they constitute a considerable part of the overall running cost of the ‘Hotel System’. Ellemme Impianti SpA has been operating for over 30 years in the building construction sector, with particular attention to plant engineering, and has developed specific expertise in the hotel and tertiary sector, acquiring the know-how, organisation, personnel and systems that enable it to offer itself as a qualified and reliable partner in all new building and hotel renovation projects.

Managing a Hotel is a 24-HOUR-NO STOP ACTIVITY

The experience gained from the numerous maintenance operations managed, has enabled an evaluation of the reliability of the individual components installed over time and an assessment of the different types of construction, resulting in a selection of the most reliable construction processes and components over time with the lowest operating costs.

PLUS

The availability of a large number of technicians/workers in all areas of plant engineering and construction makes it possible to guarantee realisations and renovations in extremely short timescales

EXPERIENCE

We have particular experience in the renovation of hotels in operation, managing to operate even on three continuous daily shifts, reserving activities without noise impact for the guests' rest hours. In this way, complex and substantial works were carried out in a very short time without altering the normal functionality of the hotel

SYNERGIES

We propose that our support be provided right from the design phases in order to create those synergies between designer and builder that lead to the optimisation and integration of all plant types within the construction. This is also in order to reduce the encumbrances of the easements generated by the systems, the realisation of holes and cavities, and above all to obtain easily accessible systems for maintenance processes in order to achieve maximum reliability and continuity of operation over time

The overall cost of a hotel refurbishment/new construction is only partly determined by the actual construction cost, for the rest, consumption, replacements and above all the ‘discontinued sale’ of rooms and/or wings of the structure play a major role.

Reliability in the overall construction of a new hotel structure or its renovation by integrating building and installations according to the customer’s requirements or by working with us on the installation work alone.