Client:
B&B Hotels Italia SpA

Project:
Dismantling of a building used as Inail offices and clinics, creation of a B&B of 3000 m2, 76 rooms + hall.

Complete demolition of all existing partitions, reconstruction with plasterboard walls to ensure acoustic comfort for users.

VRV-type air-conditioning systems capable of ensuring the maintenance of time in all rooms with the lowest possible consumption, also thanks to the use of heat recovery units for fresh air emission in all rooms and bathroom air extraction.

Electrical installations were realised starting from the Enel delivery point with distribution that saw the installation of half-floor switchboards. All lines run in conduit for ease of maintenance.

Peculiarities of the work:
Each room is equipped with its own high-sensitivity magneto-thermal switches to ensure user safety. Fire detection systems in all rooms and above ceilings.
Production of domestic hot water guaranteed by a methane gas central unit assisted by thermal solar panels to guarantee the lowest possible consumption. PVC was installed in all rooms in a high architectural performance configuration, and the special composition paints ensured high acoustic and aesthetic comfort.