Client:
Gesac SpA

Project:
Energy efficiency work on the air conditioning systems at Naples Capodichino International Airport

Peculiarities of the work:
Energy requalification of the building-plant system of Terminal 1, responsible for 70% of the energy consumption of the entire airport site.
Total energy savings = 4,311,987.93 kWh/year through installation of inverters on fans, variable flow rate of fresh air, use of free cooling
Total operating cost savings = 664,046.14 €/year.